Projected pedestrian crossing being tested in Tashkent, visible in any weather
Read more
Podrobno.uz [uz]
podrobno.uz

Projected pedestrian crossing being tested in Tashkent, visible in any weather

Testing has begun in Tashkent for a new type of pedestrian crossing, which is a projected light 'zebra'. This marking does not require painting and maintains its visibility even in poor weather conditions such as rain, fog, or after snowfall.

The technology creates a light image directly on the roadway, distinguishing it from traditional road markings. Officials from the Center for Urban Development and Design (TSODD) emphasize that this crossing remains clearly visible at night, during precipitation, and in fog, when paint-based markings often become less obvious to drivers.

One of the significant advantages of this system is its durability: the light crossing is not subject to wear from vehicle traffic and does not require periodic renewal. Furthermore, it remains visible even after heavy snowfalls.

According to the developers' vision, the bright projection helps drivers detect the pedestrian crossing in advance and reduce their speed in time, which should contribute to increased road safety. Currently, the project is operating in test mode, and if the new technology proves effective in various meteorological conditions and yields positive results, similar light 'zebras' may be installed in other parts of the capital.

Previously, an online service was launched in Tashkent allowing city residents to report issues related to pedestrian infrastructure. Using a map, users can indicate locations with broken sidewalks, missing pedestrian paths or ramps, as well as other obstacles hindering movement.

Similar stories

Canals in Tashkent are being improved: Illegal constructions will be dismantled and recreation areas created
Read more
podrobno.uz

Canals in Tashkent are being improved: Illegal constructions will be dismantled and recreation areas created

As part of large-scale improvement works along Tashkent's major canals, city authorities are strengthening the shoreline, developing recreation areas and pedestrian paths, and clearing protected territories from unauthorized buildings.

The Tashkent administration reported that work is underway on five capital canals: Bozsu, Salar, Damashi, Jun, and Burdjar. The total length of the sections undergoing improvement exceeds 66 kilometers. These canals pass through numerous districts, including Yunusabadsky, Shaykhantakhrsky, Yakkasaraysky, Chilanzarsky, Uchtepinsky, Mirzo-Ulugbeksky, Yashnabadsky, Mirabadsky, Sergelyysky, Yangikhayotsky, and Almazarsky.

Simultaneously, violations in the canals' protection zones are being eliminated. Inspections revealed 326 cases of illegal land occupation, covering a total area of 11.46 hectares. Currently, 275 illegal structures have been dismantled, freeing up an area of 8.41 hectares; work on the remaining 51 identified violations is still ongoing, meaning approximately 84% of all illegal objects have been removed.

It is planned that after the completion of shoreline reinforcement and clearing of coastal areas along the canals, comfortable places for walking and recreation will appear. This improvement aims not only to enhance the appearance of the districts but also to bring land use in water protection zones into compliance.

Furthermore, other projects for restoring water bodies are being implemented in Tashkent. For example, within the boundaries of the National Park of Uzbekistan, near the building of the Oliy Majlis Legislative Chamber, work has begun to restore a lake that was drained approximately six years ago.

Popular