The Tashkent Metro intends to significantly expand its network by 2030. According to the plans, the number of stations is expected to grow to 79, and the total length of the lines will reach 103 kilometers. Additionally, the daily number of passengers is anticipated to increase to 1.8 million people.
Information about these plans was announced during a press conference dedicated to the development of the capital's metro system. Currently, the Tashkent Metro operates with 50 stations, and the total line length is 71 kilometers.
As part of the modernization, it is also planned to reduce the intervals between passing trains to two or three minutes. It is projected that passenger traffic will increase from the current more than 1.2 million people per day to the planned 1.8 million.
The reasons for such a large-scale expansion are linked to the growing population of the capital, the active development of urban infrastructure, and the emergence of new industrial and residential areas. The development program includes the construction of new track sections, renewal of rolling stock, integration of digital technologies, and improvement of the management system.
Over the past seven years, the capital's metro has been supplemented with twenty-one new stations, and the length of its lines has increased by 33 kilometers. Meanwhile, the daily passenger flow has shown growth: in 2021, it was 280–300 thousand people, and by 2026, it exceeded 1.2 million people.



