Southern Pars Development, Phase 11, Continues Drilling of Thirteenth Well on Platform B
Read more
Tehran Times
www.tehrantimes.com

Southern Pars Development, Phase 11, Continues Drilling of Thirteenth Well on Platform B

The CEO of Petropars Group announced the continuation of drilling operations for the thirteenth well on Platform B as part of the Southern Pars Development, Phase 11. He noted that after the completion and commissioning of twelve wells in this area, drilling the thirteenth well was included in Petropars' plan beyond contractual obligations, and currently, the drilling of a 16-inch bore is underway.

According to an IRNA report from Petropars, Hamidreza Saghafi, commenting on the continuation of work on the Southern Pars general field development, Phase 11, stated that drilling of the thirteenth well on Platform B has begun with the aim of maintaining production and helping to compensate for the gas deficit in the country.

He added that the first two bores, with diameters of 32 inches and 24 inches, were drilled to depths of 186 and 933 meters, respectively, over a period of 15 days. Currently, the drilling of the 16-inch bore continues at a depth of 1010 meters.

The CEO of Petropars Group, speaking about the completion of work on the twelfth well on this platform, explained that it was drilled to a depth of over 4400 meters at an angle of 65 degrees. The perforation process in the K1, K2, K3, and K4 reservoir layers was carried out in two stages (TCP). Considering the sensitivity of the operation, petrophysical data from neighboring wells were used to increase perforation accuracy.

Saghafi continued that after perforation, more than 190,000 gallons of 32% hydrochloric acid (HCl) along with appropriate additives were pumped into the well across 20 stages. This operation was conducted at the first suitable opportunity based on weather conditions, and a method using a viscous directing agent (VDA) suitable for the temperature and pressure conditions was developed to ensure uniform distribution of the acid across the entire perforated interval, especially in the final sections of the well.

Similar stories

Complex for Agricultural Product Processing Planned in Fergana Region of Uzbekistan
Read more
uzdaily.uz

Complex for Agricultural Product Processing Planned in Fergana Region of Uzbekistan

The construction of a new industrial complex is planned in the Fergana region of Uzbekistan, which will combine the production of refrigeration equipment, deep processing of agricultural products, and modern storage facilities.

According to the regional administration, the project is being implemented by the Chinese company Haoyuan Green Cold Chain LLC, registered in the Rishhtan district.

The prospects of this project were discussed between the region's governor, Khayrullo Bozorov, and a delegation led by the company's head, Jian Yuechen.

According to the presented plans, the initial stage involves launching the production of refrigeration equipment. Subsequent phases of the project include creating capacities for deep processing of agricultural products and building modern warehouses with cold rooms.

Furthermore, the initiative involves developing logistics infrastructure, creating new jobs, and training local specialists. It is expected that this complex will expand the region's capabilities for storing and processing fruits and vegetables.

The goal of the project is to increase the added value of agricultural products and strengthen the export potential of the Fergana region.

Bozorov emphasized the importance of implementing the project according to a clear plan, guaranteeing the timely completion of the set tasks and compliance with required standards. Following the meeting, all participants agreed on the next steps to advance this initiative.

Popular