Uzbekistan and Russia held discussions on plans to establish joint ventures and localize production for the construction of a comprehensive nuclear power plant in Uzbekistan. According to a statement from the Uzatom Agency, the project aims to ensure that at least 30% of all components are produced locally.
The issues were raised at an industry conference held in Tashkent. Participants included representatives from Uzatom, relevant state bodies, Uzbek companies, specialists from Rosatom's Engineering Department, the Association of Nuclear Industry Construction Organizations, and executives from Russian companies involved in the NPP construction.
Opening the conference, Shakhzod Alirizayev, Deputy Head of Uzatom, emphasized the critical importance of practical interaction in implementing this project, which is intended to become the world's first integrated nuclear power plant. The project involves combining powerful energy units equipped with VVER-1000 reactors and smaller units with RITM-200N reactors.
Alirizayev noted that this configuration opens up opportunities to combine experience and form its own production base directly in Uzbekistan. During the first session, participants studied modern NPP construction methods, including modular assembly and systems-based approaches.
The role of leading materials science organizations and equipment manufacturers in providing technological solutions for nuclear projects was also discussed. Other topics included backup power supply systems, auxiliary heat and power plants, and components necessary to enhance the safety and efficiency of construction work.
A significant part of the conference was dedicated to the issue of production localization and the creation of joint ventures. Russian and Uzbek companies exchanged experiences in automated control systems and radiation monitoring, specialized ventilation and gas purification, polymer pipeline manufacturing, energy-efficient insulation materials, special concrete chemicals, and prefabricated structures for construction sites.
The establishment of production facilities in Uzbekistan is viewed as a way to increase the share of local goods used in the project and to form an industrial base for the further development of nuclear energy. It is expected that the cooperation will also include specialist training and the development of related industries.
The final B2B business session involved an exchange of proposals, where Russian and Uzbek firms discussed prospects for deepening partnerships, including joint production and professional training.