In the village of Kumbhi, Lakhimur-Hiri, the installation of the country's first modern biopolymer plant is underway. This plant, which will cost approximately 3080 crore rupees, utilizes technology to produce biopolymer, or plastic, from sugar. A massive reactor for this plant was ordered from Belgium and is currently being transported to Lakhimur on a specialized multi-axle trailer.
This massive truck departed from the port of Odisha on May 15th. Initially, the reactor was transported on a 308-wheel truck, but it was later converted to a special 240-wheel trailer. The journey of about 50 kilometers took four days. The reactor arrived in Varanasi on September 27th.
On Thursday, the giant truck reached the Chandmari Phase-2 area in Varanasi. The truck was temporarily stopped due to preparations for the dismantling of a bridge over a pedestrian crossing. A crowd of local residents gathered around the truck, eager to see the unusual vehicle, including children, women, the elderly, and youth. Seventy-year-old Lilavati shared that she had never seen such a large truck in her life, noting that it was being talked about in the village, and she came to see it with her neighbors.
According to staff accompanying the truck, there are three more pedestrian crossings ahead that are currently being dismantled. Once the road is cleared, the convoy will head to Ghajipur, Saidpur, Gorakhor, and Basti to reach the village of Kumbhi in Lakhimur-Hiri.
This reactor will be installed at the proposed biopolymer plant of Balrampur Shindi Mills Limited. The foundation of the plant was consecrated in the presence of Chief Minister Yogi Adityanath. Preparations for the opening ceremony, which will be attended by Prime Minister Narendra Modi, are also being discussed.
Due to delays in the arrival of the giant reactor, the plant's originally planned October opening may be postponed. There is speculation that the opening could take place in the first week of November with the participation of Prime Minister Narendra Modi. This plant will be based on modern biopolymer technology, using raw materials obtained from the sugar industry. The giant reactor, brought from Belgium for this plant with foreign technology, is currently a center of attraction for the citizens of Varanasi.

