As part of preparations for the 2026–2027 autumn-winter season, work was carried out to reconstruct the gas pipeline in the neighborhoods of Nurobod and Nurfahr, located in the Nurota district of Navoi region.
The reconstruction concerned a 159 mm diameter and 1.8-kilometer long gas pipeline that passes through these settlements.
