Gas pipeline reconstruction carried out in Nurota district of Navoi region
Read more
Uza.uz
uza.uz

Gas pipeline reconstruction carried out in Nurota district of Navoi region

As part of preparations for the 2026–2027 autumn-winter season, work was carried out to reconstruct the gas pipeline in the neighborhoods of Nurobod and Nurfahr, located in the Nurota district of Navoi region.

The reconstruction concerned a 159 mm diameter and 1.8-kilometer long gas pipeline that passes through these settlements.

Popular